The raw kitchen infrastructure and service counters were renewed, as well as the comfort room. All pre-existing finishes were removed, The only areas that were refinished were those where the finishings were essential to its operation (preparation and assembly of food, counters, and part of the fixed seating). The rest of the plaster, and ceiling and wall coverings were removed, revealing sections of exposed systems and all the imperfections of the original construction. The "truth" of the materials discovered in the construction relates to the restaurant's concept: to use simple and natural ingredients and to keep the entire food preparation process visible.
The whole ground floor are covered with the same flooring material. Most parts of the front façades are covered with a translucent glass and glass frame, which filters natural light and blurs the shapes and colors on the outside. The front facade has a LED video monitor and is shaded on the top with a overhang cladding in res and white color alternate.