1.Minimum diameter of bars used in slab = 8mm.
2. Minimum diameter of bars used in column = 12mm.
3. Minimum number of bars used in square or rectangular column = 4 bars
.

4. In Cantilever Beam Tension Zone is Up & compression zone is Below where as in simply supported Beam Compression Zone is above & Tension is Below

5.Lapping is not allowed for the bars having diameters more than 36 mm.

6. Chair spacing maximum spacing is 1.00 m (or) 1 No per 1m2.

7. For dowels rod minimum of 12 mm diameter should be used.

8. Chairs minimum of 12 mm diameter bars to be used.

9. Longitudinal reinforcement not less than 0.8% and more than 6% of gross C/S.

10. Minimum bars for square column is 4 No’s and 6 No’s for circular column.

11. Main bars in the slabs shall not be less than 8 mm (HYSD) or 10 mm (Plain bars) and the distributors not less than 8 mm and not more than 1/8 of slab thickness.

12. Minimum thickness of slab is 125 mm.

13. Dimension tolerance for cubes + 2 mm.

14. Density of Construction Material

MaterialDensity
Bricks1600 – 1920 kg/m3
Concrete block1920 kg/ m3
Reinforced concrete2310 – 2700 kg/ m3

15. Maximum diameter of bars used in slab = 1/8 × thickness of slab.


16. Free fall of concrete is allowed maximum to 1.50m.

17. Water absorption of bricks should not be more than 15 %.

18. PH value of the water should not be less than 6.

19. Compressive strength of Bricks is 3.5 N / mm2.

20. In steel reinforcement binding wire required is 8 kg per MT.

21. In soil filling as per IS code, 3 samples should be taken for core cutting test for every 100m2.

22. Samples from fresh concrete shall be taken and at least a set of 6 cubes of 150mm shall be prepared and cured. 3 Cubes each at 7 days and 28 days shall be tested for compressive strength. The test results should be submitted to engineer for approval. If results are unsatisfactory necessary action/rectification/remedial measures has to be exercised.

23. Water used for both mixing and curing shall be clean and free from injurious amounts of oils, acids, alkali, salts, sugar and organic materials or other substances that may be deleterious to concrete or steel. The PH. shall be generally between 6 and 8.

24. Lap length for M20 concrete:

Columns – 45d

Beams – 60d

Slabs – 60d

25. Standard size of brick = 190mm×90mm×90 mm = 19cm×9cm×9cm.
26. A good brick clay contains 20 to 30% of alumina, 50 to 60% of silica and the remaining constituents are Lime, Magnesia, Sodium, Potassium, Manganese and iron oxide.
27. Color of good brick is deep red, cherry or copper colored.
28. Compressive strength of bricks is 3.5 N/mm2.

29. Ordinary Portland cement consists of 62 to 67% of Lime.
30. The initial setting time of ordinary portland cement should not be less than 30 minutes.

31. The final setting time of ordinary portland cement should not be more than 10 hours.
32. Initial and Final setting time of cement is determined by Vicat’s apparatus.
46. The normal consistency of portland cement is about 25%.
47. When concrete is to be laid under water, Quick setting cement is used.
48. Maximum free fall of concrete allowed to 1.50m.

49. Curing time of RCC Members for different types of cement

Super Sulphate cement: 7 days Ordinary Portland cement

OPC: 10 days

Minerals & Admixture added cement: 14 days

50. Deshuttering Period of RCC member

RCC MemberDe-shuttering time
For columns, walls, vertical form works16-24 hrs.
Soffit formwork to slabs3 days (props to be refixed after removal)
Soffit to beams props7 days (props to refixed after removal)
Beams spanning upto 4.5m7 days
Beams spanning over 4.5m14 days
Arches spanning up to 6m14 days
Arches spanning over 6m21 days

51. Test On Fresh Concrete 

     (a). Slump Test – Workability.     (b). Compacting Factor.     (c).  Vee-Bee Test.

52. Test On Hardened Concrete 

     (a). Rebound (Schmidt) Hammer Test.     (b). Ultrasonic Pulse Velocity Test.


53. The excess of silica in the clay makes the brick brittle and weak.
54. Process of manufacturing of bricks consists of Preparation of brick clay, Moulding bricks, Drying of bricks and Burning of bricks.
55. Moulding of bricks may be hand moulding or machine moulding.
56 .The burning of dry bricks is done either in clamp or in a kiln.
57. The ingredients of ordinary cements are Lime, Silica, Alumina, Calcium sulphate, Iron oxide, Magnesia, Sulphur & Alkali’s.
58. Ordinary Portland cement consists of 62 to 67% of Lime.

59.Slump Range of concrete

Concrete MixesSlump range in mm
Columns, Retaining walls75-150 mm
Beams & Slabs50-100 mm
CC Pavements20-30 mm
Decks of bridge30-75 mm
Vibrated Concrete12-25 mm
Huge Mass constructions25-50 mm

60. Electrical conduits shall not run in column.

61. Earth work excavation for basement above 3 m should be stepped form.

62. Any back filling shall be compacted 95% of dry density at the optimum moisture content and in layers not more than 200 mm for filling above structure and 300 mm for no structure.

63. soling is specified the soling stones shall be laid at 45° to 60° inclination (and not vertical) with interstices filled with sand.

64. A set of cube tests shall be carried out for each 30 cum of concrete / each levels of casting / each batch of cement.

65. Water cement ratio for different grades of concrete shall not exceed 0.45 for M20 and above and 0.50 For M10 / M15.

66. For concrete grades M20 and above approved admixture shall be used as per mix design requirements.

67.Cement shall be stored in dry places on a raised platform about 200mm above floor level and 300mm away from walls. Bags to be stacked not more than 10 bags high in such a manner that it is adequately protected from moisture and contamination.

68. Cube Quantity

Quantity of ConcreteNo. of cubes required
1 – 5 m31 No’s
6 0 15 m32 No’s
16 – 30 m33 No’s
31 – 50 m34 No’s
Above 50 m34 + 1 No’s of addition of each 50 m3

69. Height of window = 2.1m.
70. Minimum thickness of lintel = 15cm

71. 1 bag of cement = 1.25 cubit feet = 0.0347 cubic meter.
72. No. of cement bags in 1m^3 = 28.8 bags.

20 comments:

  1. Really it's an useful information! Construction equipment plays a vital role in the construction industry. It is used to complete tasks with efficiency, accuracy, and speed. Construction equipment helps to reduce the amount of time and labor needed to complete a project, enabling projects to be completed faster and more efficiently. You can also visit this site to get more info or sell or buy any kind of heavy equipment.

    ReplyDelete
  2. This comment has been removed by the author.

    ReplyDelete
  3. This blog is taking good contact carry about Construction Knowledge, i really appreciate your blog your blog helpful for other people who’s in industry before reading your blog i have never know about of this facts and am glad to sharing this blog for other. visit here:- https://australiainside.com/how-much-does-a-bulldozer-weigh/

    ReplyDelete
  4. Thanks for sharing this nice blog about important points of construction. It is very interesting and helpful for everyone. I appreciate the time and effort that you spend to write this article. Keep up writing this type of informative article in the future also. Visits How Much Does A Bulldozer Weigh? to learn about bulldozer.

    ReplyDelete
  5. Good information.


    ----------------------------------------------
    I work with ceiling panels

    ReplyDelete
  6. This blog is providing fantastic contact information regarding construction knowledge, and I truly appreciate how it helps other individuals in the field. Before reading your blog, I was unaware of these facts, therefore I'm happy to share it with others. If someone has passionate about the builders valuable insights to share, "Day in Australia" offers you an excellent platform to showcase your expertise. With their "Write for Us - Builders" opportunity, you can contribute your knowledge and experiences to a wider audience and make a positive impact on the builders community.

    ReplyDelete
  7. This blog is a great reminder of the fundamental aspects of construction knowledge that we should never overlook. Understanding the basics is like laying a strong foundation for any construction project. From safety protocols to materials selection and building codes, these key points are the building blocks of success in try. Thanks for the concise and informative blog!

    ReplyDelete
  8. I appreciate the depth of research you put into your articles. Your analysis of Cássio Cunha Lima was eye-opening.

    ReplyDelete
  9. Wonderful blog! This article is a valuable resource! It's essential to have a solid foundation in construction principles, and this article provides a clear and concise overview. Thanks for sharing!

    ReplyDelete
  10. Your blog post on the basic important points of construction knowledge is an excellent resource for those in the construction industry and anyone interested in understanding the key principles. Construction is a complex field, and your insights are valuable for both beginners and experts. For more construction-related content, you might find Australia Cite to be a helpful source. Thanks for sharing this fundamental construction knowledge!

    ReplyDelete
  11. Great article! These basic construction points are essential for anyone in the industry. It's a good reminder to always focus on safety, quality, and planning. Thanks for sharing this information.  To know more click here

    ReplyDelete
  12. Great post! Thanks for sharing these basic points of construction knowledge. It's so important to have a solid foundation in this field. Understanding materials, safety, and the importance of planning can make all the difference in a successful construction project. Looking forward to more insightful content like this! To know more click here

    ReplyDelete
  13. Great post! These basic construction points are essential for anyone starting in the industry. It's crucial to understand these fundamentals before diving into more complex projects. Thanks for sharing this valuable information! Visit here

    ReplyDelete
  14. Great post! This breakdown of basic construction points is incredibly helpful, especially for someone like who is just starting to learn about the construction process. The emphasis on safety, quality materials, and skilled labor resonates well. Looking forward to more informative content like this! Visit here

    ReplyDelete
  15. Great article! The basic important points of construction are often overlooked but play a crucial role in ensuring a project's success. From solid foundation work to meticulous planning, these key elements can make or break a construction endeavor. It's refreshing to see a concise breakdown of these fundamental aspects. Keep up the good work! Visit here

    ReplyDelete
  16. Great Post! It effectively highlights the fundamental points of construction, providing a clear and concise overview. The emphasis on foundational aspects is crucial for both beginners and seasoned professionals. The straightforward presentation makes it easy to grasp the essential concepts. Looking forward to more insightful content like this! Visit here

    ReplyDelete
  17. "Fantastic blog summarizing essential construction knowledge! Clear and Gutter Guard King points make it a valuable resource for anyone in the industry."

    ReplyDelete
  18. Fantastic post! I appreciate you giving these fundamental construction knowledge elements. In this industry, having a strong foundation is crucial. An understanding of materials, safety, and the value of planning is critical to the success of any construction project. Anticipating more thought-provoking articles such as these! Visit here:- Total Secure Technology

    ReplyDelete
  19. The construction knowledge shared on this blog is invaluable, and I'm glad to have come across it. It's great to see such comprehensive information that can benefit others in the field. If you're passionate about sharing insights with construction builders, consider leveraging "Day in Australia's" "Write for Us - Builders" opportunity to reach a wider audience and contribute positively to the builders' community.

    ReplyDelete
  20. I appreciate you providing this insightful essay regarding crucial building details. It is really beneficial to everyone and highly interesting. I value the time and energy you invested in writing this piece. Continue producing articles of similar kind in the future. Visits What Is The Weight Of A Bulldozer? to get knowledge on bulldozers. Visit Here

    ReplyDelete